Westport Canoe - Building

Home

Canoes

Building

Restoration

Supplies

Photo Gallery

About Us

Contact Us

Links

Click on a picture to see it bigger:

Building a mold:
Stations for a new mold (13851 bytes) The stations for a new mold
Connecting the stations(18349 bytes) Jack connecting the stations with basswood strips
Attaching clinching strips(15800 bytes) Attaching metal clinching strips to the mold
Building a canoe:
Planking a canoe (22933 bytes) Planking a canoe
Trimming the planking (21275 bytes) Trimming the planking on a 14 foot canoe
Tapering ribs (26280 bytes) Tapering ribs on the table saw
Peeling a new canoe off the mold (26442 bytes) Peeling a new 15 foot canoe off the mold